Remote Penetration Testing

Save thousands per engagement. Deploy in hours, not weeks. Same certified engineers, same hands-on test, no flights.

Remote Penetration Testing Without the Travel Costs

The Transporter puts a pentester on your network without putting one on a plane. Same hands-on test, minus the airfare, hotels, and scheduling delays.

Raxis Transporter remote penetration testing device connected on a desk

Eliminate Travel Expenses

Connect our preconfigured device to your network and our team tests your environment remotely. You get the same thorough assessment without paying for travel.

Deploy in Hours, Not Weeks

The device arrives by overnight shipping. Plug it in and testing begins within hours. You can also run our deployment script on a virtual machine instead of using the hardware.

Pentest Anytime, Anywhere

Whether you run offices across multiple time zones, data centers in different states, or hybrid cloud environments, the Transporter adapts to your infrastructure.

Why Teams Choose Raxis for Remote Testing

New code ships daily. Cloud environments shift weekly. Attackers don’t wait for your next scheduled assessment, they work the gaps between them.

Three Deployment Options

Choose the form factor that fits your environment. Every Transporter runs the same testing toolkit, so the only difference is the hardware it runs on.

Raspberry Pi

Raspberry Pi Raxis Transporter unit

This ARM-based Raspberry Pi unit offers a small footprint that fits anywhere, requires minimal power, and provides full penetration testing capabilities for most internal network assessments.

Dell Micro

Dell Micro Raxis Transporter unit

When your pentest requires additional computing power, the Dell Micro Transporter delivers Intel-based performance in the same compact form factor.

Virtual Machine

Virtual machine Transporter for cloud and virtualized environments

For organizations with cloud-based or virtualized infrastructure, the VM Transporter integrates directly into your environment. Deploy it within your VPC, hybrid cloud, or private cloud infrastructure.

Four Simple Steps to Secure Remote Pentesting

Get started in less than 24 hours with our streamlined deployment process.

Step 1: We Ship, You Receive

We ship a fully configured Transporter device to your location by overnight delivery. It arrives preconfigured, tested, and secured for your engagement, with no setup required on your end.

Step 2: Quick Connection

Plug the Transporter into any standard network port with internet access and power it on. There are no firewall rules to open and no networking changes to make. If you run into anything, our support team is available by phone, email, or video call.

Step 3: We Test, You Monitor

Our testers run the assessment remotely through the Transporter while you follow progress in the Raxis One portal. You see findings as they are confirmed, with severity ratings and remediation guidance, and you can reach the team directly with questions throughout the engagement.

Step 4: Easy Return or Retention

When testing wraps up, disconnect the Transporter, return it in the original box with the prepaid label, and you are done. You can also keep it connected for continuous testing or your next scheduled assessment. Many customers keep a Transporter onsite for quarterly or as-needed testing.

Penetration Testing Services Project status and activity feed overview

Remote Comprehensive Cybersecurity Testing

In conjunction with Raxis One, Transporter provides a comprehensive pentesting solution designed to examine your entire attack surface from any location.

  • Internal private networks
  • Private cloud and VPC application testing
  • Microservices and API security
  • Container and Kubernetes testing
  • Cloud database penetration testing
  • Wireless network testing
  • Active Directory assessment

What Our Clients Say

Notes from customers who replaced on-site penetration testing with a Raxis Transporter. Obtained from Raxis after engagement interviews and customers requested to remain anonymous.

“Being able to choose between a physical device and a VM mattered for us. We ran the VM option inside our cloud environment and it dropped right in without shipping anything.”

Cloud Infrastructure Lead, SaaS Provider

“We used to budget for flights and hotels every time we needed testing. Cutting that out of the cost without giving up the quality of the assessment was an easy decision.”

VP of IT, Electrical Products Manufacturer

“With staff spread across several states, there was no single place to send a tester. Shipping a device to where we needed it solved a problem onsite testing couldn’t.”

Director of IT, Logistics Company

Remote Penetration Testing Made Easy

Save time and money with Transporter. It runs the engagements that used to require an onsite engineer, with the same engineer at the keyboard.

Transporter: Raxis' Key to Remote Pentesting (video)

FAQ: Remote Penetration Testing

What is remote penetration testing and how does Raxis Transporter work?

Remote penetration testing lets our security team assess your internal network, applications, and systems without being physically onsite. Raxis Transporter is a secure device you connect to your network, which gives our certified testers the same access they would have from a laptop in your office, without the travel costs or scheduling delays. We ship a preconfigured device (Raspberry Pi, Dell Micro, or virtual machine) to your location, you plug it in, and our team runs the assessment remotely. This removes the $3,500 or more in travel expenses per engagement and delivers the same results as traditional onsite penetration testing.

How much does remote penetration testing cost compared to on-site testing?

Remote penetration testing with Raxis Transporter typically saves organizations $3,500 to $5,000 or more per engagement by removing travel expenses. Traditional onsite testing adds costs for airfare ($600 to $1,500), hotels ($600 to $1,500), meals and incidentals ($300 to $600), and ground transportation ($150 to $300). With Transporter, you pay for the professional services plus minimal shipping (around $50). For organizations that run quarterly testing or assess multiple locations, annual savings can reach $15,000 to $25,000 or more. The professional services fee stays in line with onsite testing, and you drop the travel overhead. Savings figures are typical estimates based on common travel costs and vary by engagement.

Is remote penetration testing as thorough as on-site penetration testing?

Yes. Remote penetration testing through Raxis Transporter provides the same coverage as traditional onsite testing. Our team gets identical network access and runs the same procedures, including internal network testing, wireless assessments, Active Directory testing, lateral movement analysis, and privilege escalation. The Transporter connects to your network the same way an onsite tester's laptop would, so our team can identify vulnerabilities, exploit weaknesses, and validate your security controls. The difference is that we work remotely, which adds scheduling flexibility and removes the weather and travel disruptions that can delay onsite engagements.

What types of penetration testing can Raxis Transporter perform?

Raxis Transporter supports penetration testing across multiple environments: - Internal Network Penetration Testing: Assess your internal network security, identify lateral movement paths, and test network segmentation - Wireless Penetration Testing: Evaluate Wi-Fi security, guest network isolation, and wireless encryption - Cloud Penetration Testing: Test Virtual Private Cloud (VPC) environments, AWS, Azure, Google Cloud, and hybrid cloud infrastructures - Web Application Penetration Testing: Assess internally hosted applications and APIs - IoT and Embedded Systems Testing: Security testing for Internet of Things devices and embedded systems - Active Directory Security Assessment: Test domain controller security and authentication mechanisms - Continuous Penetration Testing (PTaaS): Ongoing security validation integrated into your DevSecOps pipeline All testing follows the MITRE ATT&CK framework and meets compliance requirements for NIST 800-171, CMMC, PCI DSS, HIPAA, and ISO 27001.

How long does it take to deploy Raxis Transporter and start penetration testing?

Raxis Transporter deploys faster than traditional onsite testing. From initial request to active testing usually takes 24 to 48 hours, depending on our schedule. We ship the preconfigured device by overnight delivery, you receive it the next day, connect it to a network port (under 5 minutes), and our team verifies connectivity within 15 to 30 minutes. Testing starts the same day or the next business day, depending on your schedule. Onsite testing often needs 2 to 6 weeks of advance scheduling to coordinate travel, book flights, and arrange building access. For urgent assessments or incident response, Transporter gets you testing quickly without those delays.

Does Raxis Transporter meet CMMC, NIST 800-171, and PCI DSS penetration testing requirements?

Yes. Raxis Transporter satisfies penetration testing requirements for CMMC (Cybersecurity Maturity Model Certification), NIST 800-171, PCI DSS (Payment Card Industry Data Security Standard), HIPAA, GLBA, ISO 27001, and SOX. Our methodology follows the MITRE ATT&CK framework and covers vulnerability identification, exploitation, post-exploitation analysis, and remediation guidance. We provide executive summaries and technical reports that meet auditor requirements and document compliance with regulatory standards. For government contractors pursuing CMMC Level 2 or Level 3 certification, Transporter delivers the required annual penetration testing without the cost of flying C3PAO-approved assessors to your facility.

Can Raxis Transporter test multiple office locations or distributed networks?

Raxis Transporter works well for organizations with multiple offices, distributed data centers, or geographically dispersed networks. We ship multiple devices to different locations at the same time, so you can test across your infrastructure concurrently without multiplying travel costs. Testing three offices with traditional onsite testing would mean flying testers to each site, which can run $10,500 to $15,000 in travel alone. With Transporter, you pay only minimal shipping for multiple devices while running the assessments in parallel. This fits multi-location retail chains, healthcare systems with multiple facilities, financial institutions with branch networks, and organizations with remote offices.

What is Penetration Testing as a Service (PTaaS) and does Transporter support it?

Penetration Testing as a Service (PTaaS) provides continuous or on-demand testing instead of a single annual point-in-time assessment. Raxis Transporter works well for PTaaS because the device can stay connected to your network for ongoing validation. You can test new applications as they ship, recheck controls after infrastructure changes, or run quarterly testing without scheduling delays or travel coordination. PTaaS with Transporter fits into DevSecOps workflows and supports testing inside CI/CD pipelines. Many organizations keep Transporter devices deployed for continuous testing, on-demand assessments, or scheduled recurring tests, which keeps value high and costs low.

How secure is the Raxis Transporter device and what security controls are in place?

Each Raxis Transporter is hardened before deployment with the following controls: - Encrypted Communications: All traffic between the device and Raxis is encrypted in transit using TLS - Encrypted Storage: Data captured during active testing is encrypted at rest on the device - Outbound-Only Connections: The device only initiates outbound connections to Raxis infrastructure, and no inbound access is possible - Restricted Access: Only authorized Raxis testers using multi-factor authentication can reach the device - Minimal Attack Surface: Unnecessary services are disabled, and the device runs a hardened, minimal operating system - Secure Configuration: Each Transporter is configured for your engagement with unique credentials - Audit Logging: Access and activity are logged for monitoring and compliance - Physical Security: Devices can sit in a locked network closet or other secured area The Transporter undergoes its own annual security assessment and penetration testing, held to the same standards we apply to client engagements.

What happens to our data after the penetration test is complete?

Raxis follows strict data handling and confidentiality protocols. During the engagement, we redact sensitive data we encounter (credentials, PII, financial information, and similar) before it is stored, so that critical data, whether identified through our analysis or defined during scoping, is not removed from your environment or retained by Raxis. After testing concludes: - Redacted findings and supporting evidence are stored in our SOC 2 Type II compliant infrastructure - Your penetration testing report and evidence are accessible through the secure Raxis One portal - Data is retained according to compliance requirements and your contract - We can provide a data destruction certificate on request - The Transporter device is either returned to Raxis, where we securely wipe it before redeployment, or kept by your organization We do not share client data, vulnerabilities, or findings with third parties. Any third party that supports an engagement signs a nondisclosure agreement and is bound by confidentiality terms consistent with our privacy policy, and we use AI tools only where the provider commits not to train its models on customer data. For organizations with data sovereignty requirements or classified environments, we can accommodate specialized data handling procedures.

Request a quote

Tell Us What You Need Tested

We usually respond in one business day.

Please let us know what's on your mind. Include any details about your target environment, timeline, or compliance drivers.